
135 - ZIP-R for CZ 6B - New Construction? Continuous Air Control Layer for Exterior Retrofit CZ 4A?
Failed to add items
Sorry, we are unable to add the item because your shopping cart is already at capacity.
Add to Cart failed.
Please try again later
Add to Wish List failed.
Please try again later
Remove from wishlist failed.
Please try again later
Adding to library failed
Please try again
Follow podcast failed
Please try again
Unfollow podcast failed
Please try again
-
Narrated by:
-
By:
About this listen
Two great questions about wall assemblies. The boys dig deep, exploring all the variables to consider for both wall assemblies. And no big surprise: Much of the conversation is about how to get these three control layers right (water, air, thermal) and ALSO get the drying potential (vapor) correct.
PETE'S RESOURCES:
- 2021 IRC - Montana
NOTE: The IRC 2021 does NOT include any chapters on energy efficiency/energy requirements...
- Huber Table for ZIP-R recommendations for all climates
- "Check but Verify - Why We Do Multiple Blower Door Tests:" https://www.youtube.com/watch?v=WDD-BpTZJ3I
- "When to Perform a Blower Door Test (and when not to)"
No reviews yet